Consumptive use permits: when a well needs one and when it does not

People hear permit and assume one document. There are two, they answer different questions, and most households only ever meet the first.

Call (904) 675-0005Request a quote

The short answer

  • A consumptive use permit governs how much water you withdraw. It is a separate thing from the permit to construct the well.
  • Under Rule 40C-2.041 an individual permit is required at an average annual daily withdrawal of 100,000 gallons per day or more, or from a well whose largest permanent water bearing casing is six inches or greater at ground surface.
  • Domestic consumption by individual users is expressly exempt under Rule 40C-2.051, so an ordinary household well does not need one.

Two permits, two questions

A well construction permit asks whether the hole may be drilled: where it sits, how it is cased, who is licensed to do it. A consumptive use permit asks a different question entirely, which is how much water you propose to take out of the ground once it exists.

The District describes a consumptive use permit as allowing water to be withdrawn for reasonable-beneficial uses in a manner that does not interfere with other existing legal uses and protects water resources from harm. That framing is the whole logic of the thing: it is about the aquifer as a shared resource rather than about your property.

The thresholds, as the rule states them

Rule 40C-2.041, Florida Administrative Code, sets out when an individual consumptive use permit is required. An average annual daily withdrawal equal to or exceeding one hundred thousand gallons per day is one trigger. So is withdrawal equipment or other facilities with a capacity equal to or exceeding one million gallons per day.

The third trigger is the one that catches people, because it is about hardware rather than volume: withdrawals from a well in which the outside diameter of the largest permanent water bearing casing is six inches or greater at ground surface. A well can cross that line while using very little water.

There is a matching figure for surface water, where an intake or cumulative intake diameter of six inches or greater does the same thing.

The exemption that covers most people

Rule 40C-2.051 lists the uses expressly exempted, and the first of them is domestic consumption of water by individual users as defined in Section 373.019 of the Florida Statutes. That is the exemption an ordinary household well sits under, and it carries no gallons per day cap or casing diameter qualifier of its own in that rule.

Fire protection withdrawals are exempt. So are aquifer performance tests of thirty days or less, and construction dewatering below three hundred thousand gallons a day and thirty days. The list is specific and it is worth reading rather than assuming, because being nearly exempt is not a category.

Where this actually bites

Irrigation at agricultural scale is the common case in this region. A grower who has been running an old well for years may be well past a threshold nobody has looked at, and the question tends to surface when the well is replaced rather than while it is quietly working.

It also bites on the timeline. A consumptive use permit is a separate application on its own schedule, and it is not something to discover after the rig is booked. Where a job looks like it might cross a threshold, that is a conversation to have at the quoting stage.

Common questions

Does my house well need a consumptive use permit?
Almost certainly not. Domestic consumption by individual users is expressly exempted under Rule 40C-2.051. What can change the answer is the casing diameter: the rule attaches a trigger to a well of six inches or greater regardless of how modest the actual use is.
Who applies for it, us or you?
The consumptive use permit belongs to the water user rather than to the contractor, so it is filed in the property owner's name. We will tell you when a job looks like it crosses a threshold, and it is worth raising with the District early because it runs on its own timeline.