Home / Guides / Who issues your well permit in Northeast Florida
Florida rules
Who issues your well permit in Northeast Florida
This is the question nobody answers properly, so here it is. In the nine counties we work, a water well construction permit is issued by four different kinds of authority, and which one applies to you depends entirely on which county your property sits in.
The short answer
- Four different authorities issue well permits across the nine counties served.
- Duval is issued by the City of Jacksonville; St. Johns by the District directly; Bradford and Union by the Suwannee River district.
- A permit is required before construction AND before repair, modification or abandonment.
The structure, top down
The Florida Department of Environmental Protection writes the rules. Chapter 62-531 of the Florida Administrative Code covers water well contractor licensing, and Chapter 62-532 covers water well permitting and construction requirements.
The Department delegates the permitting itself to the water management districts. Each district then has its own rule chapter: Chapter 40C-3 for the St. Johns River district, Chapter 40B-3 for the Suwannee River district.
Some districts then delegate again, to county health departments or to a local government. That second delegation is where the county-by-county variation comes from.
Four answers across nine counties
In Baker, Clay, Flagler, Nassau and Putnam counties the county health department issues the permit, under a delegation agreement with the St. Johns River Water Management District. Florida's Department of Health lists 22 county health departments statewide holding such agreements, and those five are among them.
In Duval County it is neither the health department nor the district. Well permitting is run by the City of Jacksonville, whose Environmental Quality Division holds the district's only delegation agreement with a local government rather than a health department.
In St. Johns County there is no such delegation in place, so the St. Johns River Water Management District issues the permit directly.
In Bradford and Union counties the Suwannee River Water Management District issues it. Bradford is the one people get wrong: even though part of the county lies inside St. Johns River district boundaries, the Suwannee River district permits all wells in Bradford County, including that portion.
When a permit is required
Before construction of a new well, and also before the repair, modification or abandonment of an existing one. The abandonment case is the one people do not expect: plugging a well you are finished with is permitted work, not simply filling in a hole.
Well diameter also affects jurisdiction. The district itself permits wells with an outside diameter of six inches or greater at land surface, which is above the size of an ordinary residential well.
Why this is our problem and not yours
A licensed water well contractor pulls the permit. That is part of what the licence is for, and Chapter 62-531 requires twelve approved continuing-education hours in the two years before a licence is renewed, partly so that contractors keep up with exactly this.
What is worth your attention is the timeline, because four different offices means four different queues. If a closing date or a construction schedule depends on a well, the county your property is in genuinely affects how long the paperwork takes.
Common questions
Do I need a permit to replace a well pump?
What happens if a well was drilled without a permit?
Read next
Buying a house with a well
What to test, what to inspect and what to ask for before closing on a property whose water supply is its own.
Read moreAbandoning a well when you connect to city water
An unused well is an open pathway from the surface to the aquifer. Plugging one is permitted, reported work, not filling in a hole.
Read moreProtecting a well through hurricane season
Flooding contaminates wellheads and outages make a pump useless. What to do before a storm and what to do before drinking the water afterwards.
Read moreRather have somebody look at it
Call and describe what the system is doing.