Home / Guides / When the District permits your well instead of the county
Florida rules
When the District permits your well instead of the county
The county answer covers almost every household well. What it does not cover is the handful of wells the District keeps for itself, and the line between the two is drawn in inches rather than by address.
The short answer
- Most Northeast Florida counties permit ordinary wells locally under a delegation agreement with the St. Johns River Water Management District.
- Six inches is the number that changes who you deal with: a well whose outside diameter is six inches or greater at land surface is permitted by the District itself.
- Gang wells and closed-loop geothermal wells go to the District whatever their size and whatever county they are in.
The county answer, and where it stops
The St. Johns River Water Management District does not personally permit most of the wells drilled in its territory. It delegates that work, and it says so plainly: the District holds sixteen well permitting delegation agreements with local health departments, one with a city government, and one memorandum of understanding with the Suwannee River district.
The delegated counties are named on the District's own page and include Baker, Clay, Flagler, Nassau, Putnam and St. Johns, with the city of Jacksonville covering Duval. The delegation is for permitting wells that are, in the District's phrase, not permitted by the District. That last clause is the one that matters, because it means the county handles what is left over after the District has taken what it wants.
Six inches is the line
The District permits, itself, any well with an outside diameter of six inches or greater at land surface. That is a measurement at the top of the casing, not a depth and not a pump size, and it is the single most useful number to know before assuming which office an application goes to.
A four inch residential well is comfortably under the line. An agricultural or commercial well sized for volume very often is not. On a property where the existing well is old and nobody has measured it, measuring the casing is a two minute job that decides which process the replacement follows.
The three other cases the District keeps
Gang wells, which the District uses to mean two or more wells coupled together, are counted on their combined casing rather than individually. Two coupled four inch wells are not two small wells as far as the permit is concerned.
Geothermal wells are treated separately. Open loop geothermal follows the same six inch line as everything else. Closed loop geothermal goes to the District regardless of diameter, which is the one case where a small well still means a District application.
And wells in what Florida law calls a delineated area, meaning an area with known groundwater contamination or a recognised vulnerability, go to the District in counties that do not regulate them locally. The District names Duval, Lake, Orange, Putnam, St. Johns and Volusia in that context.
Why we work this out before quoting
Two applications to two different offices have two different forms and two different queues, and a permit filed with the wrong authority is not a delay of days. On a replacement with a closing date attached, that is the difference between a schedule that holds and one that does not.
It is also why a quote for a larger well is not simply a quote for a small well with a bigger number on it. The route through the paperwork is different and it belongs in the timeline from the start.
Common questions
How do I tell how wide my well casing is?
Does a bigger well need a second permit as well?
Read next
Who issues your well permit in Northeast Florida
Four different answers across ten counties. A health department, a city, and two different water management districts.
Read moreBuying a house with a well
What to test, what to inspect and what to ask for before closing on a property whose water supply is its own.
Read moreAbandoning a well when you connect to city water
An unused well is an open pathway from the surface to the aquifer. Plugging one is permitted, reported work, not filling in a hole.
Read moreRather have somebody look at it
Call and describe what the system is doing.