WELL & PUMP

Northeast Florida and Panama City nine counties served

Home / Guides / FHA well requirements

At a closing

FHA well requirements: the distances, the water test, and who measures

A property on a well can be perfectly sound and still hold up an FHA closing, because the file needs evidence of things nobody has written down. Knowing which evidence, early, is most of the job.

Call (904) 675-0005Request a quote

The short answer

  • FHA sets separation distances between a well and the septic system: 50 feet to the tank and 100 feet to the drainfield, unless the local authority requires more.
  • Water must meet the local health authority's standard, or EPA drinking water standards where no local standard exists.
  • The appraiser is not required to measure those distances. Somebody has to produce a document that attests to them, and that is usually where a closing stalls.

The separation distances

HUD Handbook 4000.1 sets minimum distances between a private well and the things that could contaminate it. The well should be at least 50 feet from a septic tank and at least 100 feet from the drainfield or absorption field. Sewer lines with permanent watertight joints are held at 10 feet, and other sewer lines at 50 feet. A well is also expected to sit at least 10 feet from the property line.

Those are floors, not targets. Where the local health authority requires greater separation, the local figure governs. In some jurisdictions the drainfield distance can be reduced where the authority permits it, which is a local question rather than a federal one and has to be confirmed locally.

Water quality, and whose standard applies

The water has to be safe to drink, and the standard is the local health authority's. Where no local standard exists, EPA drinking water standards apply instead. In practice a lender will expect a laboratory result covering bacteria, nitrate and nitrite, and lead.

Sampling matters as much as testing. A sample drawn badly fails for reasons that have nothing to do with the well, and a failed bacteriological result on a file two weeks from closing is expensive in a way a retest a month earlier would not have been.

The part that actually stalls closings

The handbook is explicit that the appraiser is not required to sketch or note the distances between the well, the property lines, the septic tank, the drainfield or the buildings. The appraiser may give an estimate where comfortable doing so, and is directed to obtain a survey or other documents attesting to the separation distances where those are available.

Read that again from a seller's side: the file needs a document that nobody in the transaction is obliged to create. On an older rural parcel there is often no survey showing the well, no septic permit on file showing the drainfield, and no measurement anywhere. That gap is not a defect in the property. It is a missing piece of paper, and it is the commonest reason a well holds up an FHA file.

What to do about it, in order

Establish early whether a survey exists showing both the well and the septic system. If it does, most of this is already answered.

If it does not, the county health department may hold the septic permit, which shows the drainfield as installed. That plus a located wellhead usually settles the distances without a new survey.

Where neither exists, the measurement has to be made and documented. That is straightforward work, but it is work with a lead time, and it wants doing at the inspection rather than at the underwriting.

Common questions

Does FHA require a well inspection?
The handbook's concern is a continuing supply of safe potable water and adequate separation from contamination sources, rather than an inspection by name. What the file needs is evidence: a water test to the applicable standard and something attesting to the distances. An inspection is how those are usually produced.
The well is closer to the drainfield than 100 feet. Is the deal dead?
Not automatically. Some jurisdictions allow a reduced distance where the local authority permits it, and the local authority's position governs. It has to be confirmed with that authority rather than assumed, and it is worth doing before anyone renegotiates.
How current does the water test need to be?
Lenders set their own currency window and it is short. Testing early enough to allow a retest, and late enough to still be current at closing, is a scheduling problem worth thinking about at contract rather than at the end.

Rather have somebody look at it

Call and describe what the system is doing.

Call (904) 675-0005 Request a quote

Call (904) 675-0005 Request a quote