getting a rig to the spot and standing it level

New Well Drilling in Bryceville

In Bryceville the drilling is often easier than getting the rig to where it has to stand.

Call (904) 675-0005Request a quote

Section through a Northeast Florida water wellA cut through the ground: a capped wellhead above grade, casing descending through sand and a clay confining layer into the limestone of the Floridan aquifer, the static water level, and a submersible pump near the bottom of the well. Depths are proportional, not to scale.Pressure tankStatic waterlevelPumpGROUND LEVELSand, water tableClay, confining layerLIMESTONE, FLORIDANProportional, not to scale.Section through a Northeast Florida water wellAn engineering section through the ground: a structure at the surface, a capped wellhead standing clear of grade, steel casing descending through a sand surficial zone and a clay confining layer into the limestone of the Floridan aquifer, the static water level, a submersible pump on a drop pipe near the bottom of the well, and the pressure tank it delivers to. Strata are hatched to convention and depths are proportional rather than to scale.04080120160Pressure tankStatic water levelunder artesian pressureSubmersible pumpGROUND LEVELSand, surficial water tableClay, confining layerLIMESTONE, FLORIDAN AQUIFERProportional, not to scale. Real depths vary across the region.
Water off right now?(904) 675-0005

A drilling rig is heavy, tall and needs to be set up level on ground that will hold it for the duration. That is an unremarkable requirement on a suburban lot with a paved drive. On the parcels out here it is frequently the hardest part of the job, and it is the thing most likely to move a date.

Three conditions cause most of the difficulty. Soft sand and low-lying ground that will carry a pickup and will not carry a rig, particularly after sustained rain. Long unimproved drives with tight turns, where the limiting factor is the turning radius rather than the width. And overhead clearance, because a rig raises a mast and anything above the site, branches or a service line, has to be clear before the mast can go up.

None of these is unusual and none of them prevents the work. What they do is make the site visit before the quote genuinely load-bearing rather than a formality. Walking the access route, identifying where the rig can stand, and agreeing what needs trimming or matting in advance is what stops a crew arriving and finding they cannot reach the spot. On properties where access is seasonal, it also decides when in the year the job should be scheduled.

Permits. Bryceville is in Nassau County, where a well permit is issued by the Florida Department of Health in Nassau County. What that involves.

Asked in Bryceville

Questions

My drive gets soft in the wet season. Does that stop the job?

It affects timing more than feasibility. Ground that will not support a rig in August may be perfectly firm in a drier month, and matting can bridge short soft sections. It is worth raising early so the schedule accounts for it.

What clearance does the rig need overhead?

Enough to raise the mast, which is considerably more than most people expect. Overhead branches and any service line crossing the site both need identifying at the survey, because they are not problems that can be solved on the day.

New Well Drilling in Bryceville

Call and describe what the water is doing.