Home / New Well Drilling / Glen St. Mary
sizing for sustained irrigation volume rather than household peaks
New Well Drilling in Glen St. Mary
An irrigation well around Glen St. Mary is specified from a volume figure, not a pressure one.
Household wells are designed around peaks. A shower, a washing machine and a dishwasher running together for a few minutes is the worst case, and the system is built to meet that briefly and then rest. Irrigation for nursery stock is the opposite problem: a moderate rate sustained for hours, repeatedly, through a season.
That inverts what matters in the specification. Peak pressure becomes less important and sustained yield becomes the whole question, which means the well itself matters more than the pump. A well that will deliver plenty for a house may not sustain an irrigation schedule without drawing down faster than it recovers, and no pump compensates for a formation that cannot supply the volume. So the number that drives the design is gallons per minute sustained over hours, and it has to come from a real yield test rather than an estimate.
That test is worth insisting on. It also feeds the permitting question, because water use above certain thresholds moves from being a construction matter into a consumptive use question with the water management district, and that is a different application on a different timeline. Establishing the intended volume at the start decides which conversation you are in, and it is much easier to establish before drilling than to discover afterwards.
Permits. Glen St. Mary is in Baker County, where a well permit is issued by the Florida Department of Health in Baker County. What that involves.
Asked in Glen St. Mary
Questions
Can one well serve both the house and the irrigation?
Sometimes, and it depends entirely on the yield. Where it can, the household supply should be protected so irrigation demand cannot leave the house dry. Where it cannot, separate wells is the honest answer.
Do I need a different permit for an agricultural well?
Construction is permitted the same way, but larger withdrawals can bring a consumptive use permit into play, which is separate and takes longer. Volume needs establishing early because it decides that.
New Well Drilling in Glen St. Mary
Call and describe what the water is doing.