Home / New Well Drilling / Hastings
separating an agricultural supply from a household one
New Well Drilling in Hastings
Around Hastings the question is often whether one well should be doing both jobs.
Farm parcels here frequently run a house and a growing operation from the same supply, sometimes because a single well was there first and sometimes because it seemed simpler. It works until the two uses start competing, and when they compete the household always loses, because irrigation draws steadily for hours while a house draws in short bursts and has no way to insist.
Separating them solves several problems at once. The household supply becomes predictable and can be specified and protected as a drinking water source, which includes being tested as one. The irrigation well can be sized for volume without that sizing being a compromise against domestic pressure. And a failure on one side stops taking out the other, which matters most during the weeks when irrigation cannot pause.
The trade-off is cost and permitting. Two wells cost more than one, and an agricultural withdrawal above certain thresholds brings a consumptive use permit into the picture alongside the construction permit, which is a separate application on a longer timeline. Whether separation is worth it depends on the scale of the growing operation, and it is a question with a real answer rather than a default. What is worth avoiding is drifting into a shared arrangement by accident and only discovering the conflict in the driest part of the season.
Permits. Hastings is in St. Johns County, where a well permit is issued by the Florida Department of Health in St. Johns County. What that involves.
Asked in Hastings
Questions
Should the house and the field share a well?
Only where the yield genuinely supports both with room to spare. Where it is marginal, the house is the use that suffers, and separating the two is usually the right answer.
Does an agricultural well need extra permits?
Construction is permitted as any well is. Larger withdrawals can additionally require a consumptive use permit from the water management district, which is separate and takes longer, so the intended volume needs establishing early.
New Well Drilling in Hastings
Call and describe what the water is doing.