building on a parcel with no utility to connect to at all

New Well Drilling in Lake Asbury

On most Lake Asbury acreage there is no connection to weigh up, so the well is part of the build.

Call (904) 675-0005Request a quote

Section through a Northeast Florida water wellA cut through the ground: a capped wellhead above grade, casing descending through sand and a clay confining layer into the limestone of the Floridan aquifer, the static water level, and a submersible pump near the bottom of the well. Depths are proportional, not to scale.Pressure tankStatic waterlevelPumpGROUND LEVELSand, water tableClay, confining layerLIMESTONE, FLORIDANProportional, not to scale.Section through a Northeast Florida water wellAn engineering section through the ground: a structure at the surface, a capped wellhead standing clear of grade, steel casing descending through a sand surficial zone and a clay confining layer into the limestone of the Floridan aquifer, the static water level, a submersible pump on a drop pipe near the bottom of the well, and the pressure tank it delivers to. Strata are hatched to convention and depths are proportional rather than to scale.04080120160Pressure tankStatic water levelunder artesian pressureSubmersible pumpGROUND LEVELSand, surficial water tableClay, confining layerLIMESTONE, FLORIDAN AQUIFERProportional, not to scale. Real depths vary across the region.
Water off right now?(904) 675-0005

A lot of our drilling here is for houses that do not exist yet. The parcels between the utility districts have no service available and no realistic prospect of it, which removes the decision that dominates the conversation closer to town. There is no main to wait for. Water comes from a well or the house does not get built.

That changes where drilling sits in the sequence. It becomes an early item rather than a late one, and it has to be coordinated with the septic system, the driveway and the house footprint rather than fitted around them once they are fixed. The order that works is: establish where the septic system can go, establish where the well can go given that, and then site the house. Done the other way round, the house lands in the middle of the parcel and both systems get squeezed into whatever is left.

There is a practical benefit to being early too. A well drilled before construction gives the site a water supply during the build, which is worth having. And permitting runs on its own timeline regardless of how the build is going, so filing early rather than at the point water is needed is what stops the well becoming the thing everything else waits for.

Permits. Lake Asbury is in Clay County, where a well permit is issued by the Florida Department of Health in Clay County. What that involves.

Asked in Lake Asbury

Questions

When in the build should the well be drilled?

Early, and before the house position is fixed. Both the well and the septic system have separation requirements that constrain each other, and it is far easier to place a house around them than to retrofit them around a house.

Can the well supply the construction site?

Usually yes, once it is completed and commissioned, and that is one of the arguments for drilling early rather than at the end.