WELL & PUMP

Northeast Florida and Panama City nine counties served

Home / New Well Drilling / Yulee

drilling now against waiting for a main that is coming

New Well Drilling in Yulee

In Yulee the question is sometimes whether to drill at all, or wait for the utility.

Call (904) 675-0005Request a quote

Section through a Northeast Florida water wellA cut through the ground: a capped wellhead above grade, casing descending through sand and a clay confining layer into the limestone of the Floridan aquifer, the static water level, and a submersible pump near the bottom of the well. Depths are proportional, not to scale.Pressure tankStatic waterlevelPumpGROUND LEVELSand, water tableClay, confining layerLIMESTONE, FLORIDANProportional, not to scale.Section through a Northeast Florida water wellAn engineering section through the ground: a structure at the surface, a capped wellhead standing clear of grade, steel casing descending through a sand surficial zone and a clay confining layer into the limestone of the Floridan aquifer, the static water level, a submersible pump on a drop pipe near the bottom of the well, and the pressure tank it delivers to. Strata are hatched to convention and depths are proportional rather than to scale.04080120160Pressure tankStatic water levelunder artesian pressureSubmersible pumpGROUND LEVELSand, surficial water tableClay, confining layerLIMESTONE, FLORIDAN AQUIFERProportional, not to scale. Real depths vary across the region.
Water off right now?(904) 675-0005

Yulee is growing quickly, and water infrastructure is following the development rather than leading it. That produces parcels where a main is genuinely planned, might be a year out or might be five, and the owner has to decide whether to put in a well now or wait for a connection that may or may not arrive on schedule.

It is a real decision rather than an obvious one, and the honest input we can offer is narrow. We can say what a well on that parcel would involve and roughly what the subsurface suggests. What we cannot tell you is when a main will actually reach your road, and anyone who claims otherwise is guessing. That question belongs with the utility and with the county, and it is worth getting in writing rather than by conversation.

What tips the balance in practice is usually timing and use. A house being built now needs water now, and waiting is not an option. A parcel being held for later development can afford to wait. And a property that will want irrigation regardless of what happens to the household supply often justifies a well on those grounds alone, because irrigation on a metered connection is expensive in a way that does not improve. Those are three different answers and they depend on facts about your plans rather than about the geology.

Permits. Yulee is in Nassau County, where a well permit is issued by the Florida Department of Health in Nassau County. What that involves.

Asked in Yulee

Questions

A water main is supposed to reach us eventually. Should I still drill?

That depends on when you need water and what for. If you are building now, the timeline decides it. If you can wait, it is worth getting the utility's own estimate in writing, because informal timelines in a fast-growing area move.

If the main arrives later, is the well wasted?

Not necessarily. Plenty of households keep the well for irrigation after connecting, which avoids paying metered rates to water a lawn. If it is genuinely going out of service, it has to be plugged under permit rather than simply disconnected.

New Well Drilling in Yulee

Call and describe what the water is doing.

Call (904) 675-0005 Request a quote

Call (904) 675-0005 Request a quote